Tracking Construction: Recognizing Work Completed
If AVI[10] and AVI[23] indicate a construction period shorter
than MV[5] indicates, then the early columns of QTR will be
dropped off, and the remaining columns will be converted to a
distribution with a number of periods to match the time
between AVI[10] and AVI[23]. The general shape of the remaining
curves is preserved, and deviations from expected completion
of work are spread evenly over the remaining periods. Costs
to date are entered as column 6 of CM and imposed by ProCash©
as the first ("to date") column of the appropriate output
reports.
| input | description | help# | importance | frequency |
| CM[;6] | Const. budget: Basis code if cost is expressed as a rate | 428 | 0 | 2 |