| SiteMap |
| input | description | help# | importance | frequency |
|---|---|---|---|---|
| MV[57] | Force basis codes -1 & -3 to include 5 or 6 selected COSTMV[ 8] | 496 | 5 | |
| COSTMV[8] | Force basis codes -1 & -3 to include 5 or 6 selected accou | 496 |
MV[57] set to 1 causes basis codes set to ¯1 or ¯3 to include the following accounts.
141.21 Engineering (only included for basis code ¯3) 141.91 Land Dev. Overhead (only included for basis code ¯3) 142 Unit Site Work (only included for basis code ¯3) 142.91 Site Dev. Overhead (only included for basis code ¯3) 143 Direct Construction Costs 143.5 Elevator & Escalator 143.6 Furniture & Equipment 143.65 Tenant Improvements 144.91 Dir.Const.Overhead (only included for basis code ¯3) 144.13 Architecture (product) (only included for basis code ¯3) 147.4 Service Structures
add pAC reference & verify accuracy